Logo

GTT Receives Tank Design Order For LNG-Fueled Container

GTT announced it has received an order from HD Korea Shipbuilding & Offshore Engineering (HD KSOE) during the second quarter of 2025 for the design of the cryogenic tanks of six new LNG-fueled container ships, on behalf of the ship-owner Capital.

Each vessel will be equipped with a tank offering a capacity of 8,000 m³, incorporating GTT’s Mark III Flex membrane containment system. These tanks will also feature the “1 barg” design, allowing an operational pressure of up to 1 barg, significantly higher than the current industry standard of 0.7 barg. This enhanced design increases LNG holding time and facilitates compliance with upcoming regulatory requirements related to cold ironing (shore-power connection during port calls).

The use of liquefied natural gas for propulsion offers a concrete response to evolving environmental regulations, achieving substantial reductions in nitrogen oxides (NOₓ), sulphur oxides (SOₓ), carbon dioxide (CO₂) and ultrafine particles. Compared to conventional heavy fuel oil, this state-of-the-art solution can prevent the emission of nearly 25,000 tonnes of CO₂ annually per vessel.

Delivery of the six vessels is scheduled between the second quarter of 2027 and the first quarter of 2028.

Marine Link

Related News

First LPG tanker docks at Enterprise Products Nech...

3 hours ago

CMA CGM Phoenix Becomes Largest Containership Ever...

2 hours ago

Japan Commits $550 Billion to U.S. Industries Incl...

2 hours ago

Kazakh Black Sea Oil Exports Resume as Tankers Giv...

1 hour ago

Iron Ore Exports Swell to Record at Australia’s To...

31 minutes ago