Logo

GTT Receives Tank Design Order For LNG-Fueled Container

GTT announced it has received an order from HD Korea Shipbuilding & Offshore Engineering (HD KSOE) during the second quarter of 2025 for the design of the cryogenic tanks of six new LNG-fueled container ships, on behalf of the ship-owner Capital.

Each vessel will be equipped with a tank offering a capacity of 8,000 m³, incorporating GTT’s Mark III Flex membrane containment system. These tanks will also feature the “1 barg” design, allowing an operational pressure of up to 1 barg, significantly higher than the current industry standard of 0.7 barg. This enhanced design increases LNG holding time and facilitates compliance with upcoming regulatory requirements related to cold ironing (shore-power connection during port calls).

The use of liquefied natural gas for propulsion offers a concrete response to evolving environmental regulations, achieving substantial reductions in nitrogen oxides (NOₓ), sulphur oxides (SOₓ), carbon dioxide (CO₂) and ultrafine particles. Compared to conventional heavy fuel oil, this state-of-the-art solution can prevent the emission of nearly 25,000 tonnes of CO₂ annually per vessel.

Delivery of the six vessels is scheduled between the second quarter of 2027 and the first quarter of 2028.

Marine Link

Related News

BMT and Sea-Changers partner to launch the BMT Nex...

2 hours ago

China Turns to Cheaper Brazil Soybeans After Meeti...

59 minutes ago

Shadow Fleet Standoff Off Scotland Signals New Era...

12 minutes ago

Evergreen Orders 23 New Containerships in $1.47 Bi...

25 minutes ago

Second Russia-Linked Tanker Loses Control Entering...

1 hour ago