Logo

GTT receives an order from HD KSOE for the tank design of 6 LNG-fuelled container ships

GTT announces it has received, during the second quarter of 2025, an order from HD Korea Shipbuilding & Offshore Engineering (HD KSOE)[1] for the design of the cryogenic tanks of six new LNG[2]-fuelled container ships, on behalf of the ship-owner Capital.

Each vessel will be equipped with a tank offering a capacity of 8,000 m³, incorporating GTT’s Mark III Flex membrane containment system. These tanks will also feature the “1 barg”[3] design, allowing an operational pressure of up to 1 barg, significantly higher than the current industry standard of 0.7 barg. This enhanced design increases LNG holding time and facilitates compliance with upcoming regulatory requirements related to cold ironing (shore-power connection during port calls).

The use of liquefied natural gas for propulsion offers a concrete response to evolving environmental regulations, achieving substantial reductions in nitrogen oxides (NOₓ), sulphur oxides (SOₓ), carbon dioxide (CO₂) and ultrafine particles. Compared to conventional heavy fuel oil, this state-of-the-art solution can prevent the emission of nearly 25,000 tonnes of CO₂ annually per vessel.

Delivery of the six vessels is scheduled between the second quarter of 2027 and the first quarter of 2028.
Source: GTT



Source

Related News

Yangzijiang Shipbuilding to invest US$825.7 mil fo...

1 hour ago

MOL invests into European Offshore Wind business |...

18 hours ago

Turkish civil society organisations reiterate thei...

21 hours ago

Samsung Heavy secures new order for three crude oi...

1 day ago

HD Korea Shipbuilding wins 340.2b-won order for tw...

1 day ago