Fatal accidents in Aliağa continue to raise seriou...
3 hours ago


GTT announces that it has received, in the fourth quarter of 2025, an order from its partner the shipyard Hanwha Ocean for the tank design of a new LNG[1] Carrier, on behalf of a North America-based ship-owner.
The vessel will be equipped with cryogenic tanks designed by GTT for the transport of LNG, offering a total capacity of 174,000 m³. These tanks will incorporate the NO96 L03+ membrane containment system, a technology developed by GTT.
Delivery of the vessel is scheduled for the second quarter of 2028.
Source: GTT